3-48 Position Meter Testing Equipment With Precise Four Quadrant Reactive Power Test
|
...48 Position Meter Testing Equipment with Precise Four Quadrant Reactive Power Test Standard Function 1. The installation of ICT in each meter position is required to test three-phase meters with closed links between the current and voltage measuring circuits (I-P links). 2. The meter test system is capable of measuring mechanical and electronic meters, as well as electronic meters, through automatic, semi-automatic or manual operation. 3.Meters...
Guangzhou GENY Electric Co., Ltd
|
96 Positions Meter Test Equipment For 1ph Energy Meter Class 0.05 120 A
|
KE8101 single phase meter test equipment is used for the test of various single phase electric and mechanical meter, multi-function meter, PLC meter, multi-rate meter and prepayment meter. Main functions: Base error test Forward / reverse active energy ......
Guangzhou Kingrise Enterprises Co., Ltd.
|
7 Inch Color LCD Automatic Portable Meter Test Equipment With 3 Position
|
...Meter Test Equipment with 3 position 7 inch color LCD Automatic Portable Three Phase Energy Meter Test Equipment with 3 position The GF302D Automatic Portable Three Phase Energy Meter Test Equipment with 3 position consists of an integrated three phase 120A current source and 500V voltage source and a class 0.05 three phase electronic reference standard meter......
Beijing GFUVE Instrument Transformer Manufacturer Co.,Ltd.
|
Single Phase Static Meter Testing Equipment 48 Position
|
HS-6103F SINGLE PHASE ENERGY METER TEST BENCH AUTOMATIC CHANGE TO CALIBRATE/TEST LINE AND NEUTRAL (48 POSITIONS) This specification for single phase dual loop energy meter test bench. Voltage Source: 1. Output Voltage Range: 0- 275/300V 2. Output Max Power......
Zhejiang Shengdi Technology Inc.
|
450V Energy Meter Test Equipment , Lab Electric Meter Testing Equipment
|
Single & Three Phase Meter Test Bench MCTB20B Technical Parameters Accuracy class 0.05, 0.1 (optional) Output Voltage Range 3*(1-450V) (P-N) Resolution 0.01% THD <0.5% Accuracy & Stability 0.05% or 0.02% Capacity ≥ 800VA/phase (20 positions) Current output......
Zhengzhou Great Electric Co.,Ltd.
|
32mm Testing Spot Diameter Energy Meter Testing Equipment with High Precision and 0.2° Observation Angle
|
*, *::before, *::after {box-sizing: border-box;}* {margin: 0;}html, body {height: 100%;}body {line-height: 1.5;-webkit-font-smoothing: antialiased;}p[style^="text-align"] img{display:inline-block}input, button, textarea, select {font: inherit;}p, h1, h2, ......
HEFEI SYNTOP INTERNATIONAL TRADE CO.,LTD.
|
Meter Test Bench Automatic Change To Calibrate / Test Line And Neutral 16 Positions
|
METER TEST BENCH AUTOMATIC CHANGE TO CALIBRATE / TEST LINE AND NEUTRAL(16 POSITIONS) Description ● Suitable design, good figure. The frame for meters and the body frame are fully made by special aluminum alloy. The table board is composed of fireproofing and heat-proof fiber materials. The whole device is in soft color and good figure. ● The coexistence of special small keyboard and PCs, convenience to use. This device can be equipped......
YUEQING YOMIN ELECTRIC CO., LTD
|
Air Entrainment Meter Concrete Testing Equipment
|
Air Entrainment Meter Concrete Testing Equipment Standard: EN 12350-7 ASTM C231 TYPE B AASHTO T152 BS 1881-106 Description: It measures the air content in fresh mix concrete. The test procedure equalizes a known volume of air in the pressure chamber, with......
Hebei Better United Import And Export Co., Ltd.
|
Test Meter For Lamp Cap And Holders Light Testing Equipment With Digital Display
|
...Test Meter For Lamp Cap And Holders Light Testing Equipment With Digital Display Product information: Lamp cap twist apparatus EOB-2 built in intelligent microprocessor, is a new generation of intelligent products, with the following characteristics: 1. It can measure the positive......
Guangzhou HongCe Equipment Co., Ltd.
|
AS/NZS 1530.3 Ingitability Testing Equipment For Fire Tests On Building Materials
|
...Testing Equipment is designed according to AS/NZS1530.3. The equipment heats samples via a gas radiant plate and calibrate with a heat flow meter. Test sample is placed in a vertical position, near the radiation plate, exposed in a clear area calibrated radiation flux.Close to the pilot flame is assembled with the test sample, but not in contact with the test......
Advanced Instruments Co.,Limited
|
