Sign In | Join Free | My entremaqueros.com
entremaqueros.com
Products
Search by Category
Home > Countertops,Vanity Tops & Table Tops >

Galvanized Temporary Prefab Accommodation Units Modular Container Dormitory Systems

Categories Prefabricated Building
AC socket rating: 16A universal
MOQ: 6units
Brand Name: YAGO Industry
LED light power: 24W
Steel frame material: Q235 galvanized steel
Model Number: YGCJ32
Place of Origin: China
Floor board: 18mm fiber cement board
Wall panel thickness: 50mm/75mm fireproof rockwool
Unit dimensions: 6.06*2.435*2.89m
Certification: ISO;CE
Supply Ability: 1500-2000units/month
Delivery Time: 25-45days
Payment Terms: L/C,T/T
Packaging Details: By Pallet or As Request
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Galvanized Temporary Prefab Accommodation Units Modular Container Dormitory Systems

China Container Modular House Systems for Prefabricated Housing, Temporary Camps, and Remote Workforce Sites
Product Introduction

This YAGO combined flatpack container camp is a large‑scale integrated temporary camp solution composed of multiple connected container units. It provides centralized accommodation, office, dining and sanitary space for large construction camps, mining bases and overseas engineering projects.

Product Description

This combined camp adopts standardized flatpack container units with Q235 galvanized steel frame and fireproof rockwool panels. Each unit is factory prefabricated with complete electrical and optional plumbing systems. Units can be connected horizontally to form large‑scale camp complex including dormitories, offices, meeting rooms, dining halls and bathrooms. Equipped with shared stair cases and corridors for convenient access. Optional triangle roofs are installed on each block for better appearance and rainproof performance. The whole camp features fast assembly, stable structure, complete functions and safe comfortable environment, suitable for large‑scale staff centralized living.

Application Scenarios
  • Large‑scale construction staff camp
  • Mining and oilfield base living quarter
  • Overseas engineering project large camp
  • Long‑term field staff centralized accommodation
  • Emergency rescue and resettlement center
Specifications
Project name: Flatpack Container 6.06*2.435*2.89m
AItemSpecification
Steel Frame System System
1Roof structureMain roof frame: Q235 galvanized Steel profile, with Automatic Powder Coated paint Roof purlin: C Section Steel, galvanized. Q235B steel
2Floor structureMain floor frame: Q235 galvanized Steel profile,with Automatic Powder Coated paint Floor purlin:C Section Steel, galvanized. Q235B steel
3Corner pillarQ235 galvanized Steel profile, Galvanized with Automatic Powder Coated paint
Container roof System
1Roof coveringGalvanized Powder Coated color painting steel Sheet.
2InsulationFiber glass with aluminum foil
3Ceiling boardGalvanized Powder Coated color painting steel Sheet.
Container floor System
1PVC flooringVinly floor leather with glue
2Floor board18mm fiber cement board
ContainerWall System
1Wall panel50mm /75mm fireproof Mineral Rockwool Sandwich panel
2DoorInsulated Steel Door
3WindowPVC sliding window, double glass, with fly screen
Container Electrical System
1Power distribution cabinetCircuits with air-break switch, leakage protector,
2LightLED light, 24W
3AC Socket16A universal, with socket box
4Common Socket10A, Universal type, with socket box
5Switch10A , with switch box
Plumbing system(Optional as per drawing)
1washbasinincluding the accessory
2Closetoolincluding the accessory
3showershower base, shower head, water mixture
4Exhaust Fan6 Inch
5water pipeinput and output water pipe
Stair case and Corridor. (Optional as per drawing)
1Stair Case and CorridorFabricated with C channel steel, square tube, Round Steel, And checkered Steel Plate
Additional Traingle Roof on Top of Each Block. (Optional as per drawing)
1Roof StructureFabricated with C section steel, Galvanized Q235 Steel.
2Roof CoveringCorrugated Galvanized Powder Coated Roof Tile
Advantages
  • Large capacity: Accommodate dozens to hundreds of people
  • Full functions: Living, office, dining, washing integrated
  • Fast construction: 30–60 days for complete camp
  • Stable structure: Safe for collective use
  • Flexible expansion: Add units as needed
  • Reusable: Disassemble and relocate to new sites
FAQ
Q: How many people can one camp accommodate?

A: Customizable from 20 to 500 people.

Q: Can we add dining hall and bathroom?

A: Yes, one‑stop full functional camp solution.

Q: How long to build a 100‑person camp?

A: Normally 30–45 days.

Q: Are stair cases and corridors safe?

A: Yes, fabricated with steel profile and checkered plate.

Q: Can the camp be moved to a new site?

A: Yes, detachable and reusable for many times.

Quality Galvanized Temporary Prefab Accommodation Units Modular Container Dormitory Systems for sale
Send your message to this supplier
 
*From:
*To: Qingdao Yago Junchi Industry Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Find Similar Products By Category:
Inquiry Cart 0