| Sign In | Join Free | My entremaqueros.com |
|
| Categories | Choke Kill Manifold |
|---|---|
| Brand Name: | Hebei Pantu |
| Model Number: | YG21 |
| Certification: | API 16C |
| Place of Origin: | China |
| MOQ: | 1 set |
| Price: | USD 50000-100000 per set |
| Payment Terms: | T/T |
| Supply Ability: | 5 sets per 3 months |
| Delivery Time: | 7 work days |
| Packaging Details: | Iron Case |
| Name: | Choke & Kill Manifold |
| Model: | YG21 |
| Bore size: | 2 9/16 Inch |
| Pressure: | 3000psi |
| Application: | Drilling Control Equipment |
| Standard: | API 16C |
| Company Info. |
| Hebei E-valves Petroleum Equipment Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
API 16C Standard Choke & Kill Manifold Drilling Control Equipment
The choke and kill manifold were attached to both sides of the BOP during the well drilling process; the choke circulation and bleed can be achieved by varying the choke valve or the manifold's gate valve. The pressure differential between the bit pressure and the case can also be adjusted. These are the instruments used for either unbalanced or balanced drilling. In the event of a well blowout or kick during drilling, open the gate valve in the middle or the choke manifold in sideways to release pressure. When mud enters the casing through the kill manifold, the well pump's high pressure can regulate the blowout and kick.
Choke & Kill Manifold Parameter
| Type | Working pressure | Main bore dia | By-pass dia. | Remarks |
| (psi) | On.) | (In.) | ||
| YG140 | 20000 | 4 1/16" 3 1/16" 2 9/16" 2 1/16" | 3 1/16" 2 1/16" 2 9/16" | Different types of combinations can be provided according to requirements |
| YG105 | 15000 | 4 1/16" 3 1/16" 2 9/16" 2 1/16" | 3 1/16" 2 9/16" 2 1/16" | |
| YG70 | 10000 | 4 1/16" 3 1/16" 2 9/16" 2 1/16" | 4 1/16" 3 1/16" 2 9/16" 2 1/16" | |
| YG35 | 5000 | 4 1/16" 3 1/8" 2 9/16" 2 1/16" | 4 1/16" 3 1/8" 2 9/16" 2 1/16" | |
| YG21 | 3000 | 4 1/16" 3 1/8" 2 9/16" 2 1/16" | 4 1/16" 3 1/8" 2 9/16" 2 1/16" |
Configuration
The choke manifold consists of choke valves, gate valves, line
pipes, fittings, pressure gauges, and other components.
Operating Instructions
(1) The working pressure of all components on the choke manifold
shall be compatible with that of the BOP stack used.
(2) The choke manifold shall be installed at a place where the
operator can reach it easily. The pressure test must be performed
before installation and the seat test pressure shall be equal to
the rated working pressure.
(3) The line pipe shall be level and straight as much as it could.
In case of the turn of the line pipe, the 120-degree steel bent
pipe shall be used. The bore of the line pipe shall be large
enough.
(4) The pressure gauge must be installed.
(5) In winter, the choke manifold can work under a low-temperature
conditions.
|