Sign In | Join Free | My entremaqueros.com |
|
Categories | Field Programmable Gate Array |
---|---|
Brand Name: | Original Factory |
Model Number: | XCVC1502-1LSEVBVA |
Certification: | Lead free / RoHS Compliant |
Place of Origin: | CN |
MOQ: | 10 |
Price: | Contact for Sample |
Payment Terms: | T/T, L/C, Western Union |
Delivery Time: | 5-8 work days |
Packaging Details: | 2197FCBGA |
Part Number: | XCVC1502-1LSEVBVA |
Instruction L1 cache: | 48KB of Instruction L1 cache |
eFUSE programming power supply: | 1.745 to 1.854 V |
Power-down pulse width(Min): | 5.00 ns |
CPM user clock maximum frequency: | 250MHz |
RAM Size: | 256KB |
Company Info. |
ShenZhen Mingjiada Electronics Co.,Ltd. |
Verified Supplier |
View Contact Details |
Product List |
1.5M XCVC1502-1LSEVBVA Integrated Circuit Chip AI Core 400MHz Field Programmable Gate Array
Product Description Of XCVC1502-1LSEVBVA
XCVC1502-1LSEVBVA Differential input resistance at 100Ω, Maximum dynamic phase shift clock frequency at 300MHz. Each memory controller has four bidirectional 128-bit system ports.
Specification Of XCVC1502-1LSEVBVA
Part Number: | XCVC1502-1LSEVBVA | AI Engine Array Clock Maximum Frequency: | 1000MHz |
---|---|---|---|
Single Rank Component: | 3200Mb/s | Dual Rank Component: | 3733Mb/s |
Minimum Frequency At The Phase Frequency Detector: | 100MHz | Maximum Dynamic Phase Shift Clock Frequency: | 300MHz |
Features Of XCVC1502-1LSEVBVA
Other Supply Product Types
Part Number | Package |
MIMX8MM6DVTLZAA | FCBGA486 |
MIMX8MN1CVTIZAA | LFBGA486 |
MIMX8MN1DVTJZAA | BGA |
MIMX8MN2CVTIZAA | BGA |
MIMX8MN2DVTJZAA | LFBGA486 |
MIMX8MN3CVTIZAA | LFBGA486 |
FAQ
Q: Are your products original?
A: Yes, all products are original, new original import is our
purpose.
Q: Which Certificates do you have?
A: We are ISO 9001:2015 Certified Company and member of ERAI.
Q: Can you support small quantity order or sample?Is the sample
free?
A: Yes,we support sample order and small order.Sample cost is
different according to your order or project.
Q: How to ship my order? Is it safe?
A: We use express to ship,such as DHL,Fedex,UPS,TNT,EMS.We can also
use your suggested forwarder.Products will be in good packing and
ensure the safety and we are responsible to product damage to your
order.
Q: What about the lead time?
A: We can ship stock parts within 5 working days.If without
stock,we will confirm lead time for you based on your order
quantity.
![]() |