| Sign In | Join Free | My entremaqueros.com |
|
| Categories | CNC Turning Parts |
|---|---|
| Brand Name: | PFT |
| Model Number: | OEM |
| Certification: | ISO9001:2015, ISO13485:2016 |
| Place of Origin: | Guangdong, China |
| MOQ: | 1PC |
| Price: | Negotiable |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 10000Pcs/ Month |
| Delivery Time: | 7-15 work days |
| Packaging Details: | As the requirement of custome |
| Type: | CNC Plastic Parts |
| Cnc machining or not: | CNC Machining |
| Micro machining or not: | Micro Machining |
| Material: | Aluminum,Copper,Stainless Steel,Plastic |
| Tolerance: | 0.01-0.05mm or Customized |
| Drawing format: | PDF/DWG/IGS/STP/ etc |
| Company Info. |
| Shenzhen Perfect Precision Product Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
Precision injection molded parts, ABS accessories,
Quick Details:
1. Keywords: injection molded parts
2. Process: injection molding
3. Color: black
4. Origin: Guangdong, China
5. Use: widely used
6. Drawing format: 2D/(PDF/CAD) 3D (IGES/STEP)
7. Equipment: CNC machining center
8. Delivery period: 1-2 weeks

Specification:
| Material | ABS PP |
| Application | Widely used |
| Color | red |
| Package | Carton Box |
| Surface treatment | Testure/Sand/MT/YS/SPI/VDI |
| Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
| Certificates | ISO9001:2015/ISO13485:2016 |
| Lead time | 1-2 weeks |

FAQ:
Q1: What is the standard length of your profile?
A: The standard length of the profile is 6020mm, and we can cut it
into a specific length to meet your project needs.
Q2: What is your minimum order quantity?
A: We do not have the minimum order quantity for new customers. We
accept small orders to support your trial orders, new designs and
market
development.
Q3: Can you provide free samples?
A: Yes, we can provide free samples, but if you do not have an
international express account, we would prefer to charge the
freight.
Q4: What is the delivery date for small orders and mass production?
A: Small orders take 1~3 working days, and mass production of
materials takes 3~15 working days. The final delivery date shall be
subject to each invoice.
Q5: What certificate do you have?
A: We have an ISO 9001 certificate.
Q6 What kind of deep process can you do?
A: CNC, drilling, milling, cutting, welding, bending, assembly.
|