| Sign In | Join Free | My entremaqueros.com |
|
| Categories | Explosion Proof LED Lighting |
|---|---|
| Brand Name: | Crown Extra |
| Model Number: | GYD830 |
| Certification: | CE, ROHS, ISO. ATEX, |
| Place of Origin: | China,Jiangsu |
| MOQ: | 1 piece |
| Price: | usd40-60 per piece |
| Payment Terms: | T/T, Western Union, L/C |
| Supply Ability: | 6000 pieces per month |
| Delivery Time: | 4-7 working days |
| Packaging Details: | Led Lights will be packed in carton, pallet |
| Product name: | Explosion-proof Light |
| EX Mark: | Ex nR IIC T6/T5 Gc/Ex tD A21 IP66 T80/95℃ |
| Color Temperature(CCT): | 5700K(Customizable) |
| Lamp Luminous Efficiency: | 130 lm/w |
| CRI (Ra>): | 80 |
| Working Temperature: | -40℃-55℃ |
| Application Area: | Zone 2,21,22 |
| Voltage rating: | AC220V(Customizable) |
| Light source: | CREE |
| IP Rating:: | IP66 |
| Company Info. |
| crown extra lighting co. ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
ATEX High Quality Led Explosion Proof Light WIthinLampshade100W
150W 200W
Features:
1. Shell made of high strength aluminum alloy casting off surface
after blast cleaning by high voltage electrostatic spray.
2. Lamp housing is made of high borosilicate toughened glass with
transmittance.It's the antiglare design.
3. Zone 2, Zone 21&22
4. Instant on crisp white light output
5. High efficiency drivers and LEDs provide, low cost operation in
harsh and heavy industrial applications
6. Isolated LED compartment reduces temperature within driver
housing
7. Multi choice of beam angle for 60° 90° 120°
Specification:
| Model | GYD830 |
| Output | 50-200w |
| Light effect | 110-125 Lm/w |
| Voltage | AC100-240V 50/60Hz |
| Size | 270x170mm |
| Weight | 8kg |
| Life Hour | 50000 hours |
| Protection level | IP65 |
| Anticorrosion grade | WF2 |
| Explosion proof mark | Ex nR e mb IIC T5 Gc/ Ex tD A21 IP66 T80℃ |
| Color Rendering | ≥70Ra |
| Beam Angle | 120° |
Installation Instructions:
| Before installation, check voltage, power and other parameters carefully and make installation preparations arrordingly to layout circuit. |
| 1. organize firstly supporting spare parts and accessories |
| 2. do shut off power before installation |
| 3. the loading capacity of the ceilingfixed item where the lamp is installed should be the same as the lamp weight |
| 4. do power-on test to make sure the lamp can be lighted |
| 5. make sure the lamp is installed firmly, turn on the light finally |

|