| Sign In | Join Free | My entremaqueros.com |
|
| Categories | SMT Mounting Machine |
|---|---|
| Brand Name: | eton |
| Model Number: | ht-e8s |
| Certification: | ccc,ce,sira |
| Place of Origin: | china |
| MOQ: | 1 unit |
| Price: | $43000/unit |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 80 units per months |
| Delivery Time: | 30 work days |
| Packaging Details: | Waterproof material packing and wooden case |
| pcb size: | 100*100mm~1200*350mm |
| pcb clamp;ing: | adjustable pressure pneumatic |
| system: | windows7 |
| software: | r&d independently |
| display: | touch screen monitor |
| input device: | keyboard,mouse |
| no. of camera: | 2 |
| POWER: | 380AC 50HZ |
| power consmption: | 4kw |
| mounting mode: | Group take cent stick, cent take cent stick. |
| components space: | 0.2mm |
| feeders stations: | 30PCS |
| nozzles: | 8PCS |
| mounting speed: | 40000CPH |
| mounting height: | 40mm |
product details

HT-E8S machine is single module multifunctional mounter with high capacity of 40000CPH. It can mount capacitors,resistors,LED3014/3020/3528/5050,IC and shaped components. It applies to power driver,electric board,lens,linear bulb,household appliance and etc.
product Technical parameters of high speed pick and place machine




Business terms of smt mounter
| Accepted delivery terms | EXW, FOB, CIF, CFR |
| Accepted payment currency | USD,CNY |
| Accepted payment type | L/C, T/T |
| Nearest port | Shenzhen |
Packing & delivery of smt mounter machine
Packing details: vacuum packing and wooden case
Shipping: Shenzhen port within 30 days after payment
Port: Shenzhen
Lead time:
| Quantity (units) | Est. Time (days) |
| 1-2 | >2 |
| 30 | To be negotiated |

Production line example of [pick and place machine


Company profile



We obtain certificates and certifications


contact
Name:Brynn
Email :Brynn@eton-mounter.com
WeChat:13802252825
Telephone:138 0225 2825
Industry related knowledge
Reflow soldering
Development stage of reflow welding technology:
According to the continuous improvement of heat transfer efficiency and welding reliability, reflow welding can be divided into five stages.
First generation
Hot plate conduction reflow welding equipment: the slowest heat transfer efficiency ,5-30 W/m2K( different material heating efficiency is different), there is shadow effect.
Second generation
infrared thermal radiation reflow welding equipment: the heat transfer efficiency is slow ,5-30 W/m2K( different material infrared radiation efficiency is different), there is shadow effect, the color of components has a great impact on the heat absorption.
Third generation
Hot air reflow welding equipment: heat transfer efficiency is relatively high ,10-50 W/m2K, no shadow effect, color has no effect on heat absorption.
Fourth generation
Gas reflux welding system: high heat transfer efficiency ,200-300 W/m2K, no shadow effect, welding process needs to move up and down, cooling effect is poor.
Fifth
Vacuum steam condensation welding (vacuum vapor phase welding) system: closed space without hole welding, the highest heat transfer efficiency of 300 W-500W/m2K.. The welding process remains static without vibration. The cooling effect is excellent, and the color has no effect on the heat absorption.
|