| Sign In | Join Free | My entremaqueros.com |
|
| Categories | Mechanized Bridge |
|---|---|
| Brand Name: | Harzone |
| Place of Origin: | China |
| MOQ: | negotiation |
| Payment Terms: | According to detailed order |
| Delivery Time: | negotiation |
| Packaging Details: | According to detailed order |
| Material: | Metal bridge |
| Feature: | Reusable Bridge |
| Capacity: | Heavy loading capacity |
| Structure: | uncomplicated |
| Status: | Sefl Fold and Unfold |
| Company Info. |
| CHINA HARZONE INDUSTRY CORP.,LTD. |
| Verified Supplier |
| View Contact Details |
| Product List |
Fast Bridge / Emergency Bridge / Mechanized Bridge With 21m Length
Fast Bridge / Emergency Bridge / Mechanized Bridge With 21m Length
is sort of emergency equipment carried by vehicle and completes
erection and retrieval by erection car. It is mostly used to erect
a bridge with a length of 21m and a width of 3.3m to ensure all
varieties of vehicles with a tracked load of up to 60 tons or an
axle load of up to 17 tons to traverse small medium rivers and dry
gaps hastily.
Specifications for Heavy Mountain Bridge | |
Tracked load / axle load | 55t / 17t |
Outline dimension (L*W*H) | 13*3.3*3.6m |
Gross weight | 32.5t |
Bridge weight | 10.5t |
Bridge length | 21m |
Negotiating length (on hard banks) | 19m |
Section length | 10.63m |
Bridge width (when expanding) | 3.3m |
Track width | 1.15m |
Section height | 0.95m |
End section height | 0.35m |
Operator | 2-3 |
Erection time | 10 min |
Max. longitudinal slope / lateral slope | ±10% / ±5% |
Allowable bank height difference | 5% |
|