Sign In | Join Free | My entremaqueros.com
entremaqueros.com
Products
Search by Category
Home > Tile Making Machinery >

Comflor 210 Comflor 60 Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing

Categories Composite Floor Deck
Brand Name: FASECbuildings
Model Number: Type 2
Certification: ISO, CE etc
Place of Origin: China
MOQ: 1000sqm
Price: USD10-20/sqm
Payment Terms: D/A, L/C, D/P, T/T, Western Union
Supply Ability: 50000sqm per month
Delivery Time: 1-4 weeks per production plan
Packaging Details: seaworthy packings
Material: Steel deckING formwork
Type: ComFlor 60, 80, 210
Color: Gray
Zinc: 275g/m2
surface: zinc spangle
width: 915mm
thickness: 1.25mm
Surface treatment: Galvanized
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Comflor 210 Comflor 60 Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing

Comflor 210 , Comflor 60 , Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing

ComFlor 60 has been much copied but never bettered, as the original new generation round shouldered trapezoidal combined 60mm profile. This design is exceptionally resistant to compressive buckling resulting in superior span capability compared to traditional decks.


ComFlor 80 is the big sister to ComFlor 60 with the same round shoulder combined profile technology applied to an 80mm deep trapezoidal shape to give big spans. The use of this profile allows a designer to reduce still further the number of secondary beams in a building.


ComFlor 210 has very effective cross stiffener technology and the deep profile shape provides a very efficient metal deck and composite slab, with a low usage of concrete. Slimflor systems have wider lower flange steel beams that allow the deck to land on the bottom flange.


The steel decking supports the wet concrete and construction loads. Temporary propping is eliminated and steel lost formwork is left in situ which gives fast, easy construction. The concrete slab requires full structural bar or mesh reinforcement. The wide range of Tata Steel formwork profiles ensure the optimum solution is available.


Specifications:

Namesteel decking formwork
Base materialHot Dipped Galvanized Steel Sheet
Steel GradeSGCC
Yield strengthQ235 or Q345 Refer to Standards GB/T1591-2008
Thicknes0.8 -1.5mm(normal 0.8,1.0,1.2)
Zinc coating60-275g/m2
Wave Height51mm-76mm
EffectiveWidth688mm-940mm

Length

0-11.8m
Less than 5.8m load in 20GP
5.8m-11.8m load in 40GP
PackingBundle ,water-proof package with steel belt
Delivery time

20 days after confirmation


Following are some of typical profiles available in market:

  1. Closed type galvanized steel floor decking
YXB51-200-600
YXB65-186-558
YXB60-253-760
YXB60-180-540
YXB51-200-600
YXB65-186-558
(2) Opened type galvanized steel floor deckingYX75-230-690
YX75-200-600
YX38-152-915
YX51-305-915
YX76-305-915
YX75-230-690
YX75-200-600
YX51-250-750
YX51-335-1005
YX76-344-688
(3) swallow tail galvanized steel floor deckingYX51-200-600
YX51-190-760
YX51-200-800
YX51-200-600

Advantages:

Easy On-Site Handling
Steel decking is delivered to site in pre-cut lengths, and in pre-packaged bundles. The bundles can be easily craned into work areas, and the individual sheets quickly layed by hand. One truck can carry 1,000 sq metres of decking at a time, and a team can install up to 400 sq metres in a day.

Speedy, Safe Construction
A composite slab effectively acts as a safe working platform. Once the slab is poured, following trades can get on with their jobs below almost immediately. At the same time, work can continue unhindered on the floors above, allowing simple installation of services. Cable trays, ductwork and service pipes can be suspended neatly underneath the slab with purpose designed clips, brackets and hangers that locate easily and quickly into recesses in the steel decking profile.


While FASEC Rebar-truss triangle welded metal decking system adapts rapid construction requirements of the main steel structure and provide fast work procedures. It can save a lot of construction time compared to traditional floor decking system. It can also improve the rigidity of the floor and save the amount of steel and concrete, so as to reduce the project budget.


The Surface embossed increase the bonding of floor deck and concrete, make the floor deck system has high-strength bearing capacity. It is totally fire-proof and can span long without middle propping.


So from cost saving and time saving view, the FASEC rebar-truss triangle welded metal decking system is better choice. However, in much of ready design, the deck is already designed and in avoiding of redesign, recalculation and re-submit/approval, we can also offer various customized steel floor deck profiles to cater for various contractors’ need, meanwhile we will offer various technical support in the aspects of load span and stress analysis etc.


Following are some typical detail:


Warmly welcome various clients from International market to enquiry and visit us!

Quality Comflor 210 Comflor 60 Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing for sale
Send your message to this supplier
 
*From:
*To: FAMOUS Steel Engineering Company
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0