Sign In | Join Free | My entremaqueros.com |
|
Categories | Advanced Metering Infrastructure |
---|---|
Brand Name: | Radarking |
Model Number: | RDK |
Certification: | ISO9001, ISO4001 |
Place of Origin: | Made in China |
MOQ: | 1 nos |
Price: | Negotiate |
Payment Terms: | Western Union, L/C, T/T |
Delivery Time: | 35 days |
Packaging Details: | Standard Package |
Model: | Automated Metering Infrastructure |
Installation: | Direct Connected |
Communication: | RS485/Carrier/GPRS/RF/PLC Communication solution |
Water Meter: | Smart Water Meter DN15, 20, 25mm |
Gas Meter: | AMR Smart Gas Meter G1.6/G2.5/G4 |
Electricity Meter: | AMR Single and Three Phase Electric Meter |
Professional Smart Meter Advanced Metering Infrastructure With GPRS / RF / PLC Module
An AMR/AMI solution is basically consisted of three layers: meter reading and control devices (mainly consisted of meters), communication devices and system/data management center.
Meter reading and control devices are basically consisited of meters with remote and automatic reading functions or features like RS485, RF, PLC, etc. There can be load switch, integrited monitor, data collector, etc.
Communication devices builds the commmunication network or channel between meter and management center. There are normally concentrator, handheld reader (HHU), communication network like GMS/GPRS, PSTN, internet, optical fibre, etc.
Management center are basically consisited of a group of computer hardware like servers, computers, printers, etc and functional software modules or softwares such as the meter (esset) management module, user or customer management module, security and structure setting module, database and report statistic module, etc. The management software can realize both off-line management and on-line management and provide service at 24 hours a day.
Meter Specification:
Parameter | 1 Phase | 3 Phase |
---|---|---|
Nominal voltage | 110/120/220/230/240V Un (40%- 130%) | 3x110/120/220/230/240V Un(30%- 135%) |
Norminal current | 5(60)A | 10(100)A |
Connection type | Whole current / CTVT connection | Whole current / CTVT connection |
Maximum current | 80A | 100A |
Frequency | 50Hz | 50Hz |
Accuracy class | IEC Class.1 | IEC Class.1 |
Voltage circuit burden | ≤1.5W & 1.2VA | ≤1.5W & 5VA |
Current circuit burden | ≤0.2VA | ≤0.5VA |
Protective class | IP 54 as IEC 60529 | IP54 as IEC 60529 |
Insulation class | 6kV Class II | 6.5kV Class II |
Surge immunity | 4 kV | 4.3kV |
Electrostatic discharge | 15kV | 16kV air discharge |
Immunity to HF fields | 80MHz to 2GHz@30V/m | 80MHz to 2GHz@30V/m |
Fast transient burst | 4.3kV | 4.3kV |
Radio interference | As CISPR22 | As CISPR22 |
Battery life without power | 10 years | 10 years |
Dimension | 160mmx112mmx71mm | 290mmx170mmx85mm |
Weight | Approximate 0.7kg | Approximate 3kg |
HOW TO USE
1. Customer goes to fee-charging center (or power sale agency &
office) and pays for the power/water/gas/heat firstly, then staff
will open account for customer through software and IC card reader-writer and
then give him an IC card with purchased amount and relevant user information inside.
2. Customer takes his IC card to home and swipes it on the
induction area of meter and then the purchased amount will be
automatically input into his meter. Then smart prepaid meter will switch on valve
to supply power/water/gas/heat.
3. Meter will alarm by showing information on the LCD/LED
constantly when there is no enough power/water/gas/heat inside the meter,the first time alarming amount can be set in advance. Meter will
alarm again by stopping work and cut supply when reach to second
alarming amount. Customer can use the remains by swiping his IC card to
reactivate meter. When the remains is also used up, meter will stop
work again. Customer can use again only after recharged.
![]() |