| Sign In | Join Free | My entremaqueros.com |
|
| Categories | Roof Panel Roll Forming Machine |
|---|---|
| Brand Name: | Sussman |
| Model Number: | SS-RP |
| Certification: | CE, SGS, ISO |
| Place of Origin: | Wuxi Jiangsu China |
| MOQ: | 1 set |
| Price: | negotiable |
| Payment Terms: | T/T L/C |
| Supply Ability: | 12 sets per month |
| Delivery Time: | 60 working days after deposit |
| Packaging Details: | Standard package with film, plastic and steel wire. |
| Material Thickness: | 0.25mm--3mm |
| Forming Speed: | up to 12m/min |
| Power Supply: | 380V 50HZ 3phase |
| Dirve System: | single chain |
| Material: | galvanized steel sheet |
| Forming Stations: | about 18 stations |
| Company Info. |
| Sussman Machinery(Wuxi) Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Metal roof panel roll forming machine
Technical Parameter
Item NO. | Description | Offered specification |
1.1 | Rolling speed | UP to 12 m per min |
1.2 | Rolling thickness | 0.25--3.0mm |
1.3 | Raw material | Quench HRC Plated Chrome |
1.4 | Dimension | 8000mm×1600mm×1200mm |
1.5 | Effective width | 836mm |
1.6 | Feeding Coil width | 1000mm |
1.7 | Roller stations | About 18 stations |
1.8 | Roller material | 45#forge steel, coated with chrome |
1.9 | Shaft diameter | Φ76mm |
1.10 | Transmission | By chain 1.2 inch |
| 1.11 | Material of chain | 45# forged steel with frequency quenching, 12A |
1.12 | Material of cutting | Cr12Mov with quench HRC58-62° |
1.13 | Tolerance | 10m+-1.5mm |
1.14 | Hydraulic station | 4kw |
Main Components
| No. | Name | Quantity |
| 1 | 3 T manual de-coiler | 1 unit |
| 2 | Main forming machine | 1 unit |
| 3 | Control box | 1 unit |
| 4 | Hydraulic station | 1 unit |
| 5 | Out tables | 2 units |
Roll Forming Machine Working Flow
De-coiler—Level device —Main roll forming machine—Hydraulic cutting— Run out table

Standard Drawing of Product
Sample U Type Pannel

Customer Visiting

After-sale Serive
- The seller take responsibility to installation and commissioning
of the equipment and free training. After machine arrive the
destination, by the request of the buyer , the seller will provide
1 technical engineer to guide installation and training , and the
buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation
by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should
pay for installation and commissioning fee 100$/day to the point
account of the seller. The two-way ticket,visa, food, hotel , the
translator and insurance are all should provide by buyer with full
responsibility.
-The seller supply technical data (including forming mould drawing,
electrical elements drawing and equipment drawing etc.)
|