| Sign In | Join Free | My entremaqueros.com |
|
| Categories | Aluminum CNC Machining |
|---|---|
| Place of Origin: | Guangdong, Mainland China |
| Brand Name: | LF |
| Certification: | ISO9001:2008 |
| Model Number: | LF-MC1035 |
| MOQ: | 100 PCS |
| Price: | Negotiable |
| Packaging Details: | Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing. |
| Delivery Time: | MOQ 1 Week, 50,000pcs 4 Weeks. |
| Payment Terms: | TT, L/C |
| Supply Ability: | 20,000 PCS Per Month |
| Part Weight: | 3.8kgs |
| OEM: | Available |
| Overall Dimension: | L450*W130*H40mm |
| Surface Treatment: | Silver Anodize (Anodized Film Thickness > 12 microns |
| Material: | Al6061 T6 |
| Application: | Audio System Panel |
| Company Info. |
| LiFong(HK) Industrial Co.,Limited |
| Verified Supplier |
| View Contact Details |
| Product List |
Silver Anodize CNC Machined Parts Of Audio Front Panel & Plate & Board
Description:
Large Image: Machined Audio Plate
Machined Audio Front Panel
Machined Audio Board
Application:Audio System Panel
Specification:
| Overall Dimension | L450*W130*H40mm |
| Surface Treatment | Silver Anodize (Anodized Film Thickness > 12 microns |
| Part Weight | 3.8kgs |
| Material | Al6061 T6 Type of Aluminum Alloy 6061 brings very good Heat dissipation; Excellent Performance In Corrosion Resistant after anodize as well. carbon steel, Alloy Steel, Stainless Steel, copper, iron |
Processing Technic:
1. CNC machining--Dilling Holes/ Threading-- Quality
Check (dimension and surface) -- Acid Washing-- Sanding Blasting-- Silver Anodize -- FQC
(Surface Vision Checking)-- Packing
2. Silver Anodize Finish Brings Very High End Surface Looking and Good Feeling For
Touching.
Facility:

CNC Machining Workshop
Advantages:
Professional Research and Design Team, Processes All Necessary Equipments: Extrusion Machine: 2 Sets; CNC Machine: 20 Sets (Maximum working platform: 1600*80), Drill/threading machining: 25 Machines
1. Strict Quality Control in Each Process and Finish Product Quality Control
2. Short Delivery Lead Time: 15-30 Days
3. Optional For OEM or ODM
4. Comprehensive After-Sale Service, Quick Responses For Daily Communication
|