Categories | steel warehouse |
---|---|
Brand Name: | yilisteelstructure |
Certification: | CE, BV, SGS,ISO |
Place of Origin: | CHINA |
MOQ: | 500 square meter |
Price: | $ 29.9 square meter |
Payment Terms: | L/C, T/T |
Supply Ability: | 100000 square meter/month |
Delivery Time: | 25 days |
Packaging Details: | Bulk packaging or Container or According to customer's requirement. Usually adopt to 40'HQ (Top open) |
Main Structure: | H Section Coulmn&Beam |
Wall&Roof: | Steel Plated or Sandwich Panel |
Color: | Optional |
Installation: | Installation Drawing, Viedo |
Purlin: | C.Z Shape Steel Channel |
Material:: | Q235/Q345 Steel |
Surface treatment:: | HDP or Painted |
Life span: | 30 Years |
Light Steel Structure Warehouse Workshop | ||
Main steel fram | Column | Q235, Q345 Welded H Section Steel |
Beam | Q235, Q345 Welded H Section Steel | |
Secondary frame | Purlin | Q235 C and Z purlin |
Knee brace | Q235 Angle Steel | |
Tie bar | Q235 Steel Pipe | |
Steel rod | Q235 Round Bar | |
Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof Panel | Steel Plated, Sandwich Panel(EPS/PU/Firberglass/Rock Wool) |
Wall Panel | Steel Plated, Sandwich Panel(EPS/PU/Firberglass/Rock Wool) | |
Accessories | Window | Plastic steel or Aluminum alloy window |
Door | Rolled up door or Sliding door | |
Downspout | PVC |
Are included in the price
Painted or hot-dip galvanized steel frame.
CE certified H colums. and rafters.
High Grade strengthen steel frame, 8% less weight than normal steel
structure.
Top-quality boltable gutters with external connections plates.
WARRANTED 20 YEARS AGAINST CORROSION. For an easy assembly without
any welding!
Hot-dip galvanized C-shaped purlin .
Hot-dip galvanized anti-sag ties with C strut braces.
Top-quality 0.4~0.65 mm steel roof panels.
Flat ridge cap and screws (on double slope buildings).
Zinc-aluminum self-tapping screws to fix the roof panels WARRANTED
30 YEARS.
Double bolted 50 x 50 mm wind-braces.
Zinc plated bolts and nuts.
High grade chemical anchors bolts.
STEEL FRAME USE LIFE 30-YEAR WARRANTY
HEIGHT | SELECT YOUR BUILDING LENGTH( Big Steel Structure Workshop) | |||||||
6M | 18M | 24M | 30M | 36M | 42M | 48M | 54M | 60M |
5M | 15M | 20M | 25M | 30M | 35M | 40M | 45M | 50M |
By using AutoCAD, Sketchup, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. Our design team will give to you the powerful of technical support.
We own a number of patents and international certifications such as SGS, Bureau Veritas, EN1090 EXC2, CE, IWE, and ISO9001 etc. Through an original concept of self-build structures, YILI Steel Structure offers convenient, cost-effective and scalable solutions for your projects.
1. Are you manufacture factory or trading company?
We are manufacture factory. And you are welcomed to visit us at any
time. The quality control flow and sales team will show you our
professionalism. Also, you will get best and most competitive price
after visiting us.
2. Is your price competitive compared to other companies?
Our business objectives are to give the best price with same
quality and best quality with the same price. We will do everything
we can to reduce your cost and guarantee you get the best product
that you paid for.
3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings and video for free. We
can send engineers as installation director or a team upon request.
4. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container
loading but anytime during the production time.
5. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements.
By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel)
and etc. we can design complex industrial building like office
mansion, super marker, auto dealer shop, shipping mall, 5-star
hotel.
6. What is the delivery time?
Delivery time depends on order quantities. In general, the delivery
time to the nearest seaport in China will be 30 days after
receiving the deposit.
7. How can you get a quotation for your projects?
You can contact us by email, phone, Alibaba TM, WhatsApp, Skype,
Viber and so on 24*7 and you will get reply within 8 hours.
![]() |
Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们
Copyright © 2009 - 2019 entremaqueros.com. All rights reserved.