Categories | Injection Grouting Packers |
---|---|
Brand Name: | Jinxing |
Place of Origin: | China |
MOQ: | 10 |
Delivery Time: | 10-15 days |
Packaging Details: | carton boxes |
Fuction: | cement injection |
Application: | Concrete |
State: | Liquid Coating |
Usage: | cement grouting |
high quality concrete cement mortar plaster spraying machine waterproof grouting pump
high quality concrete cement mortar plaster spraying machine:
1.Technical Data:
Model | HX-760 | |
Voltage | 220V | |
Power | 2200W | |
Delivery capacity | 0-8L/min | |
Delivery pressure | 25bar | |
Delivery distance | 60m | |
Delivery height | 35m | |
Maximum aggregate diameter | 2mm | |
Hopper capacity | 20L | |
Weight | 44.5kg | |
CTN’s Dimension | 1050×500×1050mm |
2. Application Places:
1.Concrete buildings, railway tunnels, highway Bridges, culverts,
urban subway, hydropower station, the dam slope harbor engineering
such as crack, construction joint, expansion joint grouting
waterproof and anchor grouting, the grouting solidarity, backfill
grouting and curtain grouting, soft rock reinforcement, honeycomb
structure, soil cement grouting or composite grouting engineering,
etc.
2. Building wall waterproof coating, cement mortar spraying, dry
powder mortar spraying, powder spraying, coating putty, really
stone paint spraying, rockery, sculpture handicraft coating
engineering etc.
3. Advantages:
Spray gun used for conveying and closed particles coating materials which is
less than 2mm.Under the combination of air compressor, atomizing
the material, and spraying evenly on the surface of the building.
Grouting Packer do the function of conveying and closing couting material. Slurry
the material into building interior, to achieve the effect of
waterproof and stop leakage.
Proper Structure can be repaired to avoid stopping working caused by the repair can
be avoided.
4. Matters Needing Attention:
1. The construction place must wear protective equipment (such as
gloves, masks, goggles, safety helmet).
2. Before construction, please pour a moderate amount of washing
powder or detergent into the hopper, then switched on 1-3 minutes,
make the pipe better wetting unobstructed with good mobility. Pure
water is not allowed, in order to protect the core will not rust
and can start smoothly next time.
3. While the machine is working, the electric box must be closed
and locked, to prevent dust and moisture intrusion, and the damage
of machine components.
4. Before work and after, often check the reducer and the bearing
seat must refuel.
5. Moving the machine in the construction place, regardless of what
distance, must pull out the power line first.
6. After construction should be clean the machine and pipe in time,
the electric box can only be brushed try, do not wash.
7. When used as a sprayer, subject to equipped with 0.25-0.36 cm3 /
min of air compressor and the special sprayer gun.
Deliver Time:
15-20days after advance payment
Payment Terms:
T/T,Western Union,Money Gram,PayPal
Friendly Links: www.everychina.com
Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们